The technicians and engineers at Reykjavik Energy have finished installing the CarbFix equipment at the injection site. To obtain a feeling for size and magnitude, nine kilometers of pipes and cables have been put in place and the two of the monitoring wells supplied with pumps installed at a depth of 360 meters i.e. five times the height of the Hallsgrimskirkja cathedral in Reykjavik. OR's technicians and engineers have done a great work. A small party was held to celebrate this successful phase.